Dienstag, 5. Oktober 2021

Domtar Espanola Paper Mill, Ontario - Layout update 2021 #2

 Spanish River Hydro Power

The module was fortified with a bottom layer that represents the water level.

Bridges and the overflow dam were placed to see how the cut out works.


The short KATO bridge was too long compared to the truss bridge above the overflow. The bridge was shortened to fit the scenery.


After a layer of primer the bridge received some weathring with powders.


While I had the powders on the desk I weathered the truss bridge, too.



The 3D printed dam was glued together, primered and received a base coat of concrete paint.


Placing the bridges and the dam on the module allowed a good view where the lake/river bed should go.


The top level of the module received some more cut outs.


A second level of brown wood was glued in to present the water level of the lake. The rocks were modled with plaster and packing styrofoam.


A second pair of feeder wires were added. 

 

For a first impression turfs and bushes were added.


A view from the lake side.


First setup of the module at FREMO AmericaN northern meeting in Delmenhorst 2021


Atlas N AMT commuter train crossing the dam overflow.

























































Fremo Meet in Delmenhorst in 2022