Montag, 12. Februar 2024

Espanola Updates Warehouse

 The warehouse and the chemicals additives unloading dock were built with evergreen sheets as metal sidings.

Also hundreds of woodsticks were glued to the border of the module.


The building was painted in a kind of vanilla color.


The huge processing tower on the right was cut in pieces and the smaller part was glues to the module.




Previous to glueing I positioned some log stacks where the wall of logs should be.


The warhouse is build of 3mm wood with glues on styrene sheets.


Inside the shed a walkway helps crews to works safe.

Keine Kommentare:

Kommentar veröffentlichen

Fremo Meet in Delmenhorst in 2022